A power cut stops production. The first question when choosing a generator is always: "How many kVA do I need?" Undersizing stalls the load; oversizing wastes fuel and capital.
kW vs kVA
- kW = kVA × 0.8 (typical power factor)
- Example: a 10 kVA generator supports roughly 8 kW of load.
Starting Current: The Overlooked Factor
Electric motors draw 3–7× their rated current at startup. A 2 kW compressor may demand 6–10 kW on start. Size for continuous load + largest motor's starting load + 20–25% margin.
Petrol or Diesel?
- Petrol: Cheaper, lighter, quieter — ideal for intermittent, low-power use (2–8 kVA).
- Diesel: Better fuel economy, longer life, suited to continuous duty — the right choice for sites and businesses.
Single or Three Phase?
Only 220 V tools → single phase. Any 380 V machinery → three phase. Note: drawing single-phase from a three-phase generator gives access to only one third of its power.